We are  survey of the area is carried out for preparing dump design and systematic drainage plan before the commencement of dumping. we are also working for grass plantation in river Dam Irrigation Project location.

we are  using Jute Soil Cover net , Jute Ground Cover  net depend open the side location
and Dumping is planned in stages and covered with lateritic material to prevent surface wash off.


Critical dump slopes are stabilized by using Geo-textiles and Vetiver grass